Product roadmap

What is shipped, in progress, upcoming.

Full transparency on EryonOne's evolutions. Deliveries are dated, work in progress and forecasts too.

Planned

Audited PDF export of the review report

A signed final report (timestamped fingerprint) will consolidate all points raised, comments and decisions of a processing run. PDF format with table of contents, suited to internal audit and regulatory submission requirements.

Planned

FDA and ISO 13485 frameworks

After MDR and ANSM, opening of international frameworks: FDA 21 CFR Part 11 and ISO 13485 for medical devices exported outside the EU. Prioritisation based on community votes.

Planned

Product suggestions area open to voting

Suggest a product improvement from the roadmap. Other users will be able to vote for your proposal, and you will be notified by email as soon as it goes into production. Limit of 5 proposals per user to stay focused.

In progress

Full regulatory file verification

Priority is refocused on the main review flow: better progress tracking, duration estimation and more readable presentation of the points raised.

Shipped

Progressive delay on resending the verification email

The "Resend email" button can no longer be used in a loop. The delay increases progressively (60s → 5min → 30min → 2h → 24h), with automatic reset after 24h of inactivity. Atomic database protection against double clicks. The verification waiting page shows the countdown in real time.

Shipped

Anthropic Claude chain ready to activate

The Claude chain is wired server-side with instructions, traceability and usage tracking. Activation outside simulation depends on the production configuration and the Anthropic API key.

Shipped

Multi-user management per account

A client account can now invite several users. Distinct owner/member roles, shared credit ledger, audit of actions per user.

FAQ - Roadmap

How to read the statuses?
Shipped = in production today. In progress = active development, delivery expected in the coming weeks. Planned = committed on the roadmap, indicative date. Under study = being scoped.
Are the dates firm?
No. Dates are indicative. Priority goes to quality rather than date. When an item slips, the status moves transparently.
Can I suggest an evolution?
User voting arrives in June 2026. Until then, write to us via the contact form: we read everything and factor it into prioritisation.
Why does a given framework come later?
Prioritisation takes into account the volume of client requests, the stability of the text, and the availability of a domain expert to validate coverage. The order is not fixed.

An idea for EryonOne?

Votable suggestions arrive in June 2026. Until then, create your account to follow updates.